Browsing as Guest. Progress, bookmarks and attempts are disabled.
Log in to track your work.
Nov 2008 p4 q4
3616
A load of mass 160 kg is lifted vertically by a crane, with constant acceleration. The load starts from rest at the point O. After 7 s, it passes through the point A with speed 0.5 m s-1. By considering energy, find the work done by the crane in moving the load from O to A.
Solution
First, calculate the distance moved using the formula for average velocity:
\(s = \frac{(u + v)}{2} \times t\)
where \(u = 0\) m/s (initial speed), \(v = 0.5\) m/s (final speed), and \(t = 7\) s.